相关文章
友情链接

·高温高压反应釜的操作要点

4、设备本身各工艺接管上的自备件,安全阀,必须按反应釜的要求配备。

1, high temperature and high pressure reaction kettle reducer injection before starting the 46 # machine oil, open the machine cover by hand rotating blades check any card idle phenomenon, impeller with and without wall phenomenon, clean up the kettle in dirt, to boot. Run idle for 30 minutes without abnormal noise, vibration, then he will officially continual production.

2, high temperature and high pressure reaction kettle to use at the appointed place, and shall be carried out in accordance with the instructions operation.

3, find out the engraved on the subject container test pressure, working pressure and highest use temperature conditions, to use in the conditions for its allowable range.

When using high temperature and high pressure reaction kettle, should follow the following several points:

1, after installation check the connection parts and transmission parts is firm and reliable, the connecting pipe, tube, seal and the air test, should be no bubble, run, drip, leak phenomenon.

2, should be installed on the strong, smooth work bench, bench height according to the usage decision, equipment and should leave some space around the table (360 cm) or higher, so that the installation and the maintenance of late.

3 and the installation requirements, a transmission axis horizontal vertical, not vertical degree (gradient) equipment shall not be greater than the total height of 1/1000.

4, equipment itself the process control of self-provided on a relief valve must be equipped with according to the requirement of the reaction kettle.